Sir Adam Beck Hydroelectric Power Stations Tours

Best Sir Adam Beck Hydroelectric Power Stations Tours & Trips

The two stations redirect water from the Niagara and Welland rivers above Niagara Falls to the lower section of the Niagara River. Adam Beck I began generating power in 1922 and was named after Beck in 1950 on the 25th anniversary of the hydroelectricity advocate's death. Adam Beck II started making power in 1954. The 174 megawatt stations are a National Historic Site of Canada and the site is owned by Ontario Power Generation. Sir Adam Beck Hydroelectric Power Stations are one of North America's largest energy generators.
Show All
3 Results
Filters
Places
Dates & Length
eSIM for UK (34 EU Countries) | 7 to 30 Days with Up to 45GB of Data | eSim with Mobile Data Package for Selected Duration
5.0
Tour Code: 744555
Start / End City
Duration
1.0 Day
City & Attractions
London
Languages
English Live
Group Type
Standard Group
From
$10.00
APAC eSIM Data Plan: 7-Day / 15-Day | Instant QR Code Activation | Convenient Setup | Flexible Usage
5.0
Tour Code: 743319
Start / End City
Duration
1.0 Day
City & Attractions
Languages
English Live
Group Type
Standard Group
From
$13.10
【For All U.S. Residents】All-Inclusive China Visa Agency Service: Professional, Reliable and Cost-Effective丨Form Filling & Submission Included
5.0 ( 5 reviews )
Tour Code: 671151
Start / End City
Duration
1.0 Day
City & Attractions
Languages
Chinese Live
Group Type
Standard Group
From
$275.00
Why book with Tours4fun?
Best Price Guarantee
Transparent Pricing
Travel Safety Assurance
24/7 Multilingual Support

Insider Travel Offers

Sign up for early access to new tours, limited-time offers & travel perks.